Storage & flexibilitySTORAGE / GRID

Storage & flexibility

Battery storage and dispatchable generation can help align when electricity is available with when the energy system needs it.

PHENDHEY LING / PRAGUE SCROLL TO EXPLORE
STORAGE / RESPONSE / SYSTEM

Flexibility aligns supply with system need.

Storage shifts electricity across time. Flexible generation can adjust supply to demand and system conditions. PHENDHEY’s history includes project companies that later progressed into both paths under subsequent ownership.

STORERESPONDDELIVER
TWO PATHS / ONE POWER SYSTEM

Different technologies. Different jobs.

Battery systems absorb and release electricity; dispatchable generation adjusts output as required. They can complement one another, but they are not interchangeable assets.

01

Battery storage

Stores electricity and returns it later, shifting availability from one point in time to another.

SHIFT ENERGY THROUGH TIME
02

Dispatchable generation

Can adjust output as demand and system conditions change. Its role depends on plant design, fuel, permits and operating requirements.

ADJUST GENERATION TO NEED
RENEWABLE GENERATION
STORAGE
GRID + DEMAND
Aerial view of the Tušimice energy development site and later-stage battery project area.
TUŠIMICE / LATER-STAGE BESS DEVELOPMENT
TUŠIMICE / BATTERY STORAGE

A later-stage battery project at transmission scale.

FVE Sever alfa and FVE Sever beta were directly held by PHENDHEY in 2023. Under subsequent ownership, the companies became part of the Tušimice battery-storage project. ADI describes the Second Foundation section as planned for 200 MW / 400 MWh, with a direct 400 kV connection to ČEPS.

200+ MWPlanned output · Second Foundation section
400 MWhPlanned storage capacity
400 kVDirect connection to ČEPS
PHENDHEY DIRECT OWNERSHIP09 May — 05 September 2023

FVE Sever alfa and FVE Sever beta were held directly during this period. The capacity and grid milestones above describe the later project stage, not current PHENDHEY assets.

Open case study
DISPATCHABLE POWER / PROJECT HISTORY

Flexible generation followed a separate ownership path.

Two former PHENDHEY project companies later moved into the CENTROPOL group at different times. Public updates describe milestones reached under subsequent ownership.

01

PDL Předlice s.r.o.

03 June 2022 — 05 March 2026

PHENDHEY DIRECT HOLDINGSUBSEQUENT PROJECT STAGE

CENTROPOL acquired the former PHENDHEY company in 2026. Transaction counsel described its associated natural-gas power project as ready to build.

02

PEL Teplo s.r.o.

03 June 2022 — 18 October 2023

PHENDHEY DIRECT HOLDINGSUBSEQUENT PROJECT STAGE

After the 2023 transition to CENTROPOL, a later GENTEC update referenced electrical-infrastructure construction and four KE-MTUNG 2000 CHP units.

These are historical project lineages. Later development, financing and construction milestones belong to subsequent owners and project teams, not PHENDHEY’s current holdings.

Open case study