GRID INFRASTRUCTUREINFRASTRUCTURE / GRID

Sahara Grid Infrastructure

Transmission-scale infrastructure linked to the later-stage PDL Transformation project context.

High-voltage infrastructure works at Tušimice
400 / 110 / 35 kVCurrent published grid levels
400 MVAEarlier published transformer rating
400 MW / 800 MWhBroader Sahara BESS design context
1,600 MWhPublished expansion potential
Relationship to PHENDHEY

Relationship to PHENDHEY

PDL Transformation was directly held by PHENDHEY from January to April 2023. The project vehicle later progressed under subsequent ownership.

Later-stage project context

Project context

Earlier ADI material states that it began construction of the R-SAH 110/400 kV substation with PDL Transformation and references a 400 MVA transformer. Current May 2026 material describes the broader R-SAH site as 400/110/35 kV and the surrounding Sahara storage programme at 400 MW / 800 MWh, potentially up to 1,600 MWh.

Context note

PHENDHEY’s connection is the historical ownership of PDL Transformation; the infrastructure described here belongs to the project’s subsequent development stage.